A sneak peak in to what the Slackware ARM build machines are currently up to:
Slackware branch | Status |
---|---|
slackwareaarch64-current | No activities enqueued. OUT OF SYNC with public repository |
slackwarearm-15.0 | IN SYNC with public repository |
[ Build host: Linux bladswede.arm.slackware.com 6.1.65-armv8 #1 SMP PREEMPT Sun Dec 3 16:55:02 GMT 2023 aarch64 GNU/Linux ]
OS installation date..: 08-Oct-23
Slackware distribution: slackwareaarch64-current
Machine identification: AArch64 current, RockPro64 v2.1, 4GB RAM
Machine status........: Master for aarch64
Present date..........: Sun Dec 10 07:30:01 GMT 2023
Uptime................: 5 days, 23 hours, 30 minutes
Load average..........: 0.00, 0.00, 0.00
r2b build status......: Batch completed successfully
First build began on..................: Sat Dec 9 19:13:35 GMT 2023
Most recent package began building on : Sat Dec 9 19:42:38 GMT 2023
Success count...: 3 (75%) [ recently: a/kernel-firmware, d/mercurial, x/ibus-m17n ]
* Will build Kernel after this final pass (if pass completes successfully)
* Will run SITs after this final pass (if pass completes successfully)
Build pass......: 2 of 2
Activities......:-
Building package x/libva-utils [ 4 of 4 ]
r2b callout: launching System Integration Tests helper
r2b callout: r2b System Integration Tests helper complete
r2b callout: launching Kernel and Installer helper
r2b callout: r2b Kernel and Installer helper complete
Total elapsed time....................: 474 minutes / 7 hours / 0 days
*** Complete.
[ Build host: Linux zippy-150.arm.slackware.com 5.15.139-armv7 #1 SMP Wed Nov 22 07:30:49 GMT 2023 armv7l Allwinner sun8i Family GNU/Linux ]
OS installation date..: 07-Feb-22
Slackware distribution: slackwarearm-15.0
Machine identification: Slackware 15.0 32bit stable builder, Orange Pi Plus 2E (H3) v1.1, 2GB RAM
Machine status........: Master for armv7l
Present date..........: Sun Dec 10 07:30:01 GMT 2023
Uptime................: 2 weeks, 2 days, 22 hours, 2 minutes
Load average..........: 0.00, 0.00, 0.00
r2b build status......: Batch completed successfully
First build began on..................: Fri Dec 1 08:44:02 GMT 2023
Most recent package began building on : Fri Dec 1 08:44:13 GMT 2023
Build pass......: 1 of 1
Activities......:-
Building package patches/samba [ 1 of 1 ]
Total elapsed time....................: 123 minutes / 2 hours / 0 days
*** Complete.